Attenzione: i dati modificati non sono ancora stati salvati. Per confermare inserimenti o cancellazioni di voci è necessario confermare con il tasto SALVA/INSERISCI in fondo alla pagina
IRIS Catalogo Istituzionale della Ricerca dell'Università degli Studi del Molise
The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, al.l GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and tt). The Linac and Damping Ring are situated on the surface, while the subterranean Booster and Collider are housed ina100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs fketory. In its baseline design with synchrotron radiation (SR) power of30 MW per beam, it can achieve a luminosity of 5 x1034 cm-2s-1 per interaction point (IP), resulting in an integrated luminosity of 13 ab 1 for two IPs over a decade, producing 2.6millionHiggsbosons. IncreasingtheSRpowerto 50MWperbeam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements ofHiggs coupling at sub-percent levels, exceeding the precision expected from the HLLHCbyanorderofmagnitude. This Technical Design Report(TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout, performance metrics, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, al.l GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and tt). The Linac and Damping Ring are situated on the surface, while the subterranean Booster and Collider are housed ina100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs fketory. In its baseline design with synchrotron radiation (SR) power of30 MW per beam, it can achieve a luminosity of 5 x1034 cm-2s-1 per interaction point (IP), resulting in an integrated luminosity of 13 ab 1 for two IPs over a decade, producing 2.6millionHiggsbosons. IncreasingtheSRpowerto 50MWperbeam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements ofHiggs coupling at sub-percent levels, exceeding the precision expected from the HLLHCbyanorderofmagnitude. This Technical Design Report(TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout, performance metrics, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11695/138450
Citazioni
ND
6
ND
social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2023-2025 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 589/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.